Rehabilitation work will be carried out on the concrete lining of the Frukov Krč tunnel (direction to Zagreb) from 9.9.-23.10.2026.
During the works, traffic will flow in both directions on the opposite carriageway between km 2+800 and km 5+700, according with the temporary traffic signalization.