Section Đurmanec - Trakošćan

In the period from 25.5. to 15.6.2022 reconstruction of the pavement structure from km 53 + 170 to km 53 + 270 (direction Zagreb) will be performed.
During the works, the traffic will take place in two directions on the opposite side of the highway in accordance with the temporary traffic regulation.